Hi guys i have decided to go with a new solar hot water system as well as solar power & have just had the site inspection done, now i am no fool when it comes to working around subbies & i think that these guys are trying to take me for a ride, the solar hot water system is through Origin Energy who use subbies to install there DUX systems. Ok now can anyone tell me if i need to have an RCD installed at a price of $198 inc GST ? i have spoken to my mate who is a sparky & he told me that he is pretty sure you don't need one on a fix piece of power equipment (ie hot water),
also i was told that as part of the install they allow up to 30 meters of pipe & cable for the install then extra would be at my cost & seeing that the panels would not be more then 6 meters away from the tank then allow a few meters each end i am well under 30 meters & they are trying to charge me another $215.60 for additional lagged flow & return lines
anybody else had these extra charges or think they are being taken for a ride ?
cheers Allan
PS i am on the verge of cancelling the lot